LPG Mounded Bullet | Chengalpet
India’s first project for external coating of LPG Mounded Bullets with 100% Solids Polyurethane Coating for Indian Oil Corporation at Chengelpet, Tamil Nadu.
Project Date: July 2003
Surface: Steel, Concrete
Pipeline | Haldia
The Natural Draught Cooling Towers (NDCT) at Simhadri are some of the largest in the world with a height of 165+ metres.
Project Date: December 2002
Size: 24/16" x 5 kms
Surface: Concrete
Water Pipeline | KC Valley
The Koramangala and Challaghatta (KC) Valley project is first of its kind with three STPs of 440 MLC capacity.
Project Date: March 2018
Size: 3 STPs x 440 MLC
Surface: Steel, Concrete
Pipeline Rehabilitation | Salaya Mathura
100% Solids Polyurethane are the coatings of choice under "Coatings for Repair and Rehabilitation of the External Coatings of Buried Steel Pipelines"
Project Date: October 2008
Size: 2m x 7.5kms
Surface: Steel, Concrete
Water Pipeline | PHED
Intake Water Treatment Plant and Cluster Distribution System for more than 400 villages in Rajasthan.
Project Date: July 2018
Size: 0.7m x 60kms
Surface: Steel, Concrete
Cooling Tower | Simhadri
The Natural Draught Cooling Towers (NDCT) at Simhadri are some of the largest in the world with a height of 165+ metres.
Project Date: January 2002
Size: 650,000+ sq.ft
Surface: Concrete
Seawater Pipeline | Simhadri
Internally lined several diameter steel pipes (from CW duct to towers) carrying sea water with 2,000 microns Purethane® Coating.
Project Date: January 2002
Size: 350,000+ sq.ft
Surface: Steel
Freshwater | NEWater Project
The Singapore Public Utilities Board (PUB) has set up several new plants for highly pure water called NEWater.
Project Date: December 2008
Size: 2.2m x 87kms
Surface: Steel, Concrete